农村苗族一级特黄a大片-农村偷人一级超爽毛片-农村脱精光一级-女18一级大黄毛片免费女人-国产资源精品一区二区免费-国产资源免费

Welcome to the official website of Shenzhen Ledfocus Precision Manufacturing Co., Ltd.!
News
News
Hot products

Service Hotline

0755-29727486 0755-83734215 0755-83734236
FAQ

Where are you now:Home >> News >> FAQ
What exceptions will occur during SMT production? Normally
Time:2021-10-08 Read: 2068

1. Ideal solder joints

It has good surface wettability, that is, the molten solder should spread on the surface of the welded metal and form a complete, uniform and continuous solder covering layer, and its contact angle should not be greater than 90


The correct amount of solder, the amount of solder is sufficient but not too much or too little

For a good welding surface, the surface of the solder joint should be complete, continuous and smooth, but it does not require a very bright appearance.

Good solder joint position The position deviation of the solder end or pin of the component on the pad is within the specified range.


2. No wetting

The contact angle formed by the solder on the solder joint and the surface of the welded metal is greater than 90


3. Open welding

The pad is separated from the PCB surface after soldering.


4. Suspension bridge (drawbridging)

One end of the component leaves the pad and faces the bag upright diagonally or upright


5. Bridging

The solder between two or more solder joints that should not be connected is connected, or the solder joints of the solder joints are connected with adjacent wires.


6. Welding

After soldering, electrical isolation sometimes occurs between the solder end or the pin and the pad


7. Draw the tip

There are solder burrs protruding outward in the solder joints, but they are not in contact with other conductors or solder joints


8. Solder ball

A small ball of solder that adheres to the printed board, the solder mask or the conductor during soldering.


9. Holes

Holes with different apertures appear in the weld


10. Position offset (skewing)

When the solder joint deviates from the predetermined position in the horizontal, vertical or rotational direction in the plane.


11. Visual inspection

With the aid of a magnifying glass of 2~5 times of the illumination, inspect the quality of PCBA solder joints with naked eyes


12. Inspection after aoldering

Quality inspection after PCB is soldered.


13. Reworking

Repair process to eliminate local defects of surface mount components.


14. Placement inspection

When surface mount components are mounted or after they are mounted, quality inspection is carried out for any missing, misplaced, mis-mounted, damaged, etc. conditions.


In SMT inspection, two methods, visual inspection and optical equipment inspection, are often used. Some only use the visual inspection method, and there are also two mixed methods. They can all inspect the product, but if the visual inspection method is used, people will always get tired, so there is no guarantee that employees will conduct a careful inspection. Therefore, we need to establish a balanced inspection and monitoring (monitering) strategy that is to establish quality process control points.


In order to ensure the normal operation of SMT equipment, strengthen the quality inspection of the processed workpieces in each process, so as to monitor its operating status, and establish quality control points after some key processes. These control points are usually established in the following locations:


1) PCB inspection

a. Whether the printed board is deformed; b. Whether the pad is oxidized; c. Whether the surface of the printed board is scratched;

Inspection method: visual inspection according to inspection standards.


2) Silk screen inspection

a. Is the printing complete; b. Is there any bridging; c. Is the thickness uniform; d. Is there any sag; e. Is there any deviation in the printing;

Inspection method: visual inspection according to inspection standards or inspection with magnifying glass.


3) Patch inspection

a. The placement position of the component; b. Whether there is a chip; c. whether there is a wrong part;

Inspection method: visual inspection according to inspection standards or inspection with magnifying glass.


4) Reflow soldering inspection

a. The soldering condition of the component, whether there are bad soldering phenomena such as bridging, tombstones, dislocation, solder balls, virtual soldering, etc. b. Soldering joints.

Inspection method: visual inspection according to inspection standards or inspection with magnifying glass.

Contact Us
Shenzhen Ledfocus Precision Manufacturing Co., Ltd.

Address: Room 1204, Dahong (Xinqiao) Science and Technology Innovation Park, No. 48, Xinyu Road, Shajing Street, Baoan District, Shenzhen

Phone: 0755-29727486 0755-83734215 0755-83734236

Person in charge: Mr. Fan 13088821718

Email: roman@leikashi.com

Business section #605

Email: allen@leikashi.com

Website: m.jsjmqz.cn

Service hotline
0755-83734236
? 2020 Shenzhen Ledfocus Precision Manufacturing Co., Ltd. All rights reserved 粵ICP備2021139374號
  • Links:
主站蜘蛛池模板: 成年ssswww中国女人 | 成人福利院 | 亚洲精品资源在线 | www.中文字幕| 国偷自产一区二区免费视频 | 一区二区三区网站 | 欧美激情一区二区三区四区 | 天天干b| 亚洲影视自拍揄拍愉拍 | 狠狠狠色丁香婷婷综合久久88 | 国产欧美日韩三级 | 免费看www网站入口 免费看v片 | 黄色在线免费播放 | 色综合久久婷婷天天 | 波多野结衣手机视频一区 | 成人18网站| 精品福利视频导航 | 色婷婷综合激情视频免费看 | 亚洲日韩精品欧美一区二区 | 天天爽夜爽免费精品视频 | 日本视频在线免费看 | 欧美中文一区 | 亚洲操片 | 久久久久久久国产精品毛片 | jizz视频| 国产综合久久久久久鬼色 | 狠狠色丁香久久婷婷综合_中 | 性爱视频免费 | 2021久久伊人精品中文字幕有 | 香港日本韩国三级 | 亚洲欧洲日韩另类自拍 | 日本精品中文字幕有码 | 色欧美在线| 在线亚洲v日韩v | 毛茸茸熟女 | 玖玖在线 | 久re这里只有精品最新地址 | 日本黄页免费 | 91久久精品一区二区三区 | 欧美成网站 | 黄色三级视频在线观看 |